Shuttle Ground Tracks


STS-63

o STS-63 Ground Tracks.

This represents the first eight orbits of STS-63. The eighth orbit begins at 10.59 hours from liftoff. Each orbit is 1.52 hours in duration. Click here for a color postscript file or here for a better look.


STS-63 Airglow Observation Period Plots

Shuttle ground tracks ond CEDAR coordinating ground stations are shown.
When the ground track passes within the ring around the ground station,
the GLO instrument on board the shuttle can observe the tangent point
above the station at an altitude of at least 100 km.
See the legend on the above plot.

Period 1 (MET 0/9:25 - 1/1:30). Postscript GIF
Period 2 (MET 1/13:55 - 2/1:50). Postscript GIF
Period 3 (MET 2/13:05 - 3/7:40). Postscript GIF
Period 4 (MET 3/15:53 - 4/4:50). Postscript GIF
Period 5 (MET 4/7:45 - 5/4:40). Postscript GIF
Period 6 (MET 5/10:53 - 6/0:08). Postscript GIF
Period 7 (MET 6/11:22 - 7/2:35). Postscript GIF
Period 8 (MET 7/10:15 - 8/1:00). Postscript GIF

Click the icon to leave any comments or suggestions you may have.


This HTML is under consrtuction. Thank you for your understading.


Back to LPL-West Spaceflight page
Last Updated: 09 December 1994
This page is maintained by:
Jesus A. Ramirez (ramirez@argus.lpl.arizona.edu)